Home  >  

Products  >  

Business Backpack with USB Charging Port and Laptop Compartment

Business Backpack with USB Charging Port and Laptop Compartment

This business backpack pairs a clean, professional look with practical tech-friendly features for daily commuting, office use, and business travel.

Built-In USB Charging Port: An external USB port connects to a power bank inside the bag, letting you charge a phone on the move.

Dedicated Laptop Compartment: A padded main compartment holds a laptop along with organized pouches for an ID, pens, and a phone.

Water-Resistant Fabric: The Oxford fabric and PU-film front panel resist splashes and light rain while staying wear- and tear-resistant.

Ergonomic Back Support: An S-curve pressure-relief back panel and breathable airflow-vented straps reduce shoulder and back strain during long wear.

Travel-Ready: A rear luggage strap slides over a suitcase handle, and the front and side pockets keep documents, umbrellas, and bottles within easy reach.

As a manufacturer focused on business and laptop backpacks, we support OEM and ODM orders, including custom colors, hardware, and logo branding for bulk purchases.

Item No.
ALBP-279
Material
Oxford fabric / PU film, polyester lining
Size
43 x 31 x 15 cm
Color
Black, Gray
MOQ
50
Sample Time
5 - 7 Days
Bulk Lead Time
20 - 40 Days
OEM/ODM
Available
business backpack shown on a road background lifestyle scene product specifications chart listing item number, material, dimensions and color options black and gray colorway product comparison display layered interior storage packed with a laptop, headphones and books opened main compartment labeled with ID pouch, pencil pouch, phone pouch and laptop compartment front zipper pocket holding a tablet and wallet, with side pocket holding a phone breathable back panel diagram showing airflow vents S-curve pressure-relief back panel ergonomic diagram feature grid showing USB charging port, tear-resistant fabric, luggage strap and water-resistant fabric close-up of USB charging port, zipper pulls, breathable strap padding and leather-look handle daily commute and business travel lifestyle shots of the gray and black backpacks angled front view of the black backpack side profile view showing the USB port and side pocket back view showing shoulder straps and mesh panel top-down view showing front pocket and top handle bottom view of the backpack model wearing the backpack, viewed from behind model wearing the backpack, front-facing simple styling shot man carrying the backpack by its top handle on stairs man wearing the gray colorway backpack with pinstripe trousers

OEM & ODM Backpack Manufacturing Solutions

We help brands, importers, wholesalers, and Amazon sellers build custom backpack products from concept to production.

Customization options include:

• Custom logo (embroidery, printing, embossing, rubber patch…)
• Material selection (Oxford, Polyester, Nylon, RPET, PU leather…)
• Color customization based on Pantone matching system
• Structural customization (compartments, size, pockets, functions…)
• Packaging customization for retail or e-commerce branding

Whether you are launching a new brand or expanding your product line, we provide full OEM/ODM support from sampling to mass production.

Strict Quality Control Process

Every order is carefully inspected to ensure product consistency and durability.

• Raw material inspection before production
• In-line production quality monitoring
• Final inspection before packaging
• Functional and durability testing based on product type

We ensure every backpack meets export-quality standards before shipment.

Production & Order Information

• MOQ: 50–500 pcs (varies by model and customization)
• Sample lead time: 3–7 days
• Bulk production time: 20–40 days
• Flexible OEM & ODM support for different business scales

We support both small trial orders and large-scale production.

Request Pricing & Samples

Contact us for pricing, MOQ, samples, and customization options. Our backpack manufacturing specialists will provide a tailored solution based on your project requirements.

Find What You Need

Get a Free Quote

Tell us your requirements and our team will contact you soon.

Request a Free Quote

Our team will review & respond within 2 hours

Request a Quote

We’ll review your request and respond within 2 business hours.